CCSD Burkholder Replacement Middle School

CCSD Burkholder Replacement Middle School

Henderson, Nevada

Client:  SH Architecture/Clark County School District

Taney Engineering as a sub-consultant to SH Architecture served as the Civil Engineer of Record for the design of the replacement of Burkeholder Middle School for Clark County School District. The project involved replacing the 50 year old existing middle school and campus with a new building and facilities. The building was designed to LEED Gold Certification. The gym and courtyard were preserved from the existing facility. Due to the slope of the site the elevations were terraced which presented site design challenges. Taney converted a large ditch at the front of the school into an underground storm drain facility to channel water around buildings into the collection system. The underground system presented the opportunity for a landscaped frontage for the school.

  • Phototypical Design
  • Boundary Survey
  • Topographic Survey
  • Site Planning & Design
  • Technical Drainage Study
  • Traffic Study
  • Hydrologic Analysis
  • Water & Sewer Distribution
  • Grading & Utility Plans
  • Storm Drain
  • Street and Parking Lot
  • Striping, Signage, Streetlights
  • Multi-Modal Design
  • Construction Staking
  • Coordination with CLV
  • Coordination with BLM