top of page

Burkeholder Middle School Replacement

Location: Henderson, Nevada

Client: KNIT Studios/CCSD

Completion: 2007

 

 

 

 

Taney Engineering is the civil engineer for the design of the replacement of Burkeholder Middle School for Clark County School District. The project involved replacing the 50-year-old existing middle school and campus with a new prototype building and facilities. The building is designed to LEED Gold Certification. The gym and courtyard were preserved from the existing facility. Due to the slope of the site, the elevations were terraced which presented site design challenges. Taney converted a large ditch at the front of the school into an underground storm drain facility to channel water around the buildings into the collection system. The underground system presented the opportunity for a landscaped frontage for the school.

 

Services:

  • Prototypical Design

  • Boundary Survey

  • Topographic Survey

  • Site Planning & Design

  • Technical Drainage Study

  • Traffic Study

  • Hydraulic Analysis

  • Water Network Analysis

  • Water & Sewer Distribution System

  • Grading and Utility Plans

  • Storm Drain

  • Street and Parking Lot

  • Striping, Signage, Street Lights

  • Construction Staking

  • Coordination with the City of Henderson

  • Coordination with the Bureau of Land Management

  • Right-of-Way Grant

  • Public Agency Approvals

  • Working Sessions with Stakeholders

  • Designed to LEED Gold Certification by USGBC