TANEY ENGINEERING, INC.
CIVIL ENGINEERS & LAND SURVEYORS
Lone Mountain & Berg Industrial Buildings
Location: North Las Vegas, Nevada
Client: EBS
Completion: 2020
Lone Mountain Corporate Center is a 450,731SF cross doc industrial development at the corner of Lone Mountain & Berg in North Las Vegas. This is a 23.84 acre, multi-tenant facility. Taney provided all civil engineering and land surveying. This project was a challenge due to the existing perimeter streets being flat, Taney worked with the City of North Las Vegas to put in flat curbs. Fire accessibility was also a challenge. Taney worked with the architect to divert onsite parking and had to shift around the Lone Mountain entry.
Services:
-
BOUNDARY SURVEY
-
SURVEY + AERIAL TOPOGRAPHY
-
ALTA/NSPS LAND TITLE SURVEY
-
HYDROLOGY STUDY
-
TRAFFIC STUDY WAIVER
-
WATER NETWORK ANALYSIS
-
PROJECT MANAGEMENT
-
GRADING PLAN
-
STREET PLAN & PROFILE
-
UTILITY PLAN & PROFILE
-
HORIZONTAL CONTROL PLAN
-
TRAFFIC PLAN
-
STIE PLANNING
-
ROUGH GRADING
-
WATER & METERS
-
SANITARY SEWER & LATERALS
-
TEMPORARY CURB FOR UTILITIES
-
FINAL CURB & GUTTER
-
FINISHED FLOOR ELEVATION
-
BUILDING STAKING
-
TRASH ENCLOSURES
-
BUILDLING PAD REDHEADS
-
BUILDING PAD BLUETOPS
-
PARKING LOT REDHEADS, BLUETOPS, AND LIGHTS