top of page

Paul Meyer Park Baseball Field Turf Replacement

Location: Las Vegas, Nevada

 

Client: Suzana Rutar Architect/Clark County Real Property Management

 

Completion: 2020

 

 

 

 

As a subconsultant to Suzana Rutar Architect and for Clark Country Real Property Management, Taney Engineering provided civil engineering and land surveying services for the replacement of artificial turf the baseball field at Paul Meyer Park. This included topographic survey, grading, and drainage base per turf manufacturer specifications in the outfield only.

 

Services:

  • Geotechnical Report and Borings (1)

  • Construction Documents

  • Bidding Assistance

  • Construction Contract Administration

  • Project Closeout

  • Topographic Survey

bottom of page