top of page

Ruby Thomas Elementary School Replacement

Location: Las Vegas, Nevada

 

Client: KNIT Architecture/CCSD

Completion: 2022

 

 

Taney Engineering provided civil engineering and land surveying for this new replacement elementary school. The school is a 91,500sf, two story, CMU design prototype. Civil site design included demolition, utilities, water/sewer, drainage, parking, curb & gutter, lighting, sidewalks, ADA, and playground. Challenges included the site being old and had an extensive hydrology issue. There was an elevation issue against the neighbor’s property, and some utility challenges. To resolve these the Taney team filled in the trench for the drainage issue, added retaining walls and a chain link fence to protect neighbors property and all utilities and site was brought up to current standards and code.

 

Features:

 

  • Boundary Survey

  • Survey + Aerial Topography

  • Hydrology Study

  • Channel/Storm Drain Analysis

  • Traffic Study

  • Water Network Analysis

  • Project Management

  • Grading Plan

  • Utility Plan & Profile

  • Traffic & Horizontal Control Plan

  • Demolition Plan

  • Specifications

  • Construction Administration

  • Site Planning

  • Parcel Map

  • Easements