top of page
Taney LOGO-1-in.jpg

TANEY ENGINEERING

CIVIL ENGINEERS & LAND SURVEYORS

Railroad Pass & I-11 Industrial

Location:  Henderson, Nevada

​

Client:  Overton Moore Properties

​

Completion:  Ongoing

Gateway 11 Industrial Park is located in the Southeast portion of Henderson near I-11 and Boulder City. The site consists of four buildings and is the beginning of an expansive industrial area. Taney Engineering is the civil engineer and land surveyor for the industrial park. The first phase is approximately1.75M SF. The sitework includes building grading, drainage, water/sewer, utilities, paving, and a roadway connection for Railroad Pass of approximately 2000 LF through the industrial park.

​

Services:

​

  • Zone Change (Conforming) To IG (Industrial General)

  • Waivers

  • Design Review

  • Hydrology Study

  • Traffic Study

  • Water Network Analysis

  • Project Management

  • Grading Plan

  • Street Plan & Profile

  • Utility Plan & Profile

  • Traffic & Horizontal Control Plan

  • Septic & Leach Field Design

  • Site Planning

  • Boundary Verification

  • ALTA/NSPS Land Title Survey

  • Easements (Legal & Exhibit)

​​

© 2020 by Taney Engineering, Inc.

bottom of page